Dongshan Port Donggu Operation Area Shugang Highway High Speed ​​Connection Line Exported to Donggu Ancient Engineering Investigation and Design (second time)

The bidding project Dongshan Port Donggu Operation Area Shugang Highway Expressway Connection to Donggu Project Survey Design (the second time) has been approved by the Dongshan County Development and Reform Bureau, East Development and Reform [2016] No. 138, and the project owner is Dongshan County Haitong Construction Engineering Co., Ltd., the construction funds from the owners of self-raised and superior subsidies, the project investment ratio of 100%, the bidder for Dongshan County Haitong Construction Engineering Co., Ltd.. The project already has the conditions for tendering. The project is now undergoing an open tender for the survey and design.

2. Project overview and scope of tender
2.1 Project Name: Dongshan Port Donggu Operation Area Shugang Highway Expressway Linkage Exported to Donggu Ancient Engineering Investigation and Design (second time);
2.2 Total Investment of Project and Source of Funds: The total investment of the project is estimated to be 665.66 million yuan. The funds are raised by the owners themselves and the superior subsidy.
2.3 Construction site: The project starts from the high-speed exit of Shugang Highway, passes through Tongtang Town, Xitong Highway, passes through the west side of Xiashanqian Village and the back of the temple, passes through the foothills of Laoshan Mountain, passes through the north side of Xialin Village, and is connected with the planned Huandao Road, east to Donggu Village separated from Huandao Road, finally to Donggu Village, connecting with Donggu Pier Road;
2.4 Technical Standards: This project is designed according to the standard of Grade 2 highways and urban trunk roads, with a design speed of 60km/h, two-way 6 lanes, a red line width of 40m, 20m green belts on each side, and asphalt concrete pavement. Other technical indicators are implemented in accordance with the relevant regulations of the Ministry of Communications "Highway Engineering Technology Standards" (JTGB01-2014).
2.5 Bidding scope: Phase II project of Shugang Highway in the Donggu Harbor Donggu Operation Zone, from the exploration of the Shishiping intersection to the roundabout of the Huandao Road, about 1.5 kilometers long; the third phase of the Donggang Port Donggu Operation Area Shugang Road, from the West Copper Highway to the Xialin Village, 5.1 kilometers long. Including geotechnical survey (initial survey, detailed survey), engineering survey (initial survey, fixed survey), construction drawing design of highway project, guiding construction organization design, design summary, budget documentation, drawings of each bid section and bill of quantities Compilation; follow-up service work for all roads.
2.6 Division: One bid section.
2.7 Work content: Including geotechnical investigation (initial survey, detailed survey), engineering survey (initial survey, fixed survey), highway project (including route, roadbed, pavement, bridge, tunnel) and ancillary facilities (including ventilation, fire protection, and power supply Lighting, monitoring and emergency rescue, etc.), crossover, greening, landscape design and other projects; traffic engineering and facilities along the route (including management and service facilities for road projects, security protection, marking and marking, monitoring, communications, charging, power supply lighting Etc.) Relevant construction drawing design, guiding construction organization design, design summary, preparation of budget documents, drawing of each bid section, preparation of bill of quantities, and related follow-up service work for the entire road section.
2.8 survey and design cycle:
(1) Completing the preparation of the construction drawing design text and construction drawing budget (including the bill of quantities) of the project within 60 days from the signing of the survey and design contract, and submitting the qualified construction drawings and survey report;
(2) After the construction drawing has passed the examination by the competent authority, the construction draft shall be submitted within 10 days;
(3) Provide design follow-up services during the construction phase.
3, bidder qualification requirements
3.1 The bidder shall have a valid and valid business license for a corporate entity and have an independent legal personality.
3.2 The bid requires bidders must also have:
(1) Qualified and effective engineering design comprehensive category A qualification or road industry (road, traffic engineering) professional Grade A qualification and municipal industry (road) engineering Grade A qualification;
(2) Qualified and effective engineering survey comprehensive class A qualification.
3.3 The bidder has completed survey and design performance of highway engineering (a single project length of 5 kilometers) at or above Grade 2 highways since January 01, 2012.
3.4 This project accepts bids from the Consortium. The bid invitation project allows units with design and survey qualifications to voluntarily form a consortium to participate in bids. Voluntary consortiums should be units with corresponding design qualifications as consortium leaders, and all parties Should have the appropriate qualifications to undertake the bidding project. In accordance with the Consortium Agreement, each member unit of the Consortium assumes the contents of its own professional work and determines the level of qualifications based on the respective professions it undertakes. If there is no specific division of labor in the Consortium Agreement, the consortium formed by the same professional units shall be classified according to the level of qualifications. The lower unit determines the level of qualification; no more than two (including two) members of the consortium; each member of the Consortium shall no longer bid alone in its own name, nor may it participate in bids of two or more consortia at the same time. Any violation will cancel the qualifications of the members of the consortium and consortium.
3.5 Project Leader: Senior engineer and above professional titles. Over the past five years, he has served as the person in charge of the engineering survey and design project for at least 1 road class 2 or above with a mileage of more than 5 km (including 5 km).
3.6 Affiliated companies with investment shares, or parent companies with direct management and managed relationships, or subsidiaries of the same parent company, or two or more legal persons whose legal representative is the same person (above collectively referred to as affiliated companies, but the State Council is state-owned The central enterprises that are directly supervised by the asset supervision and administration agencies are not affiliated with the "parent company" prescribed in this article, and the second-level subsidiaries of their first-level subsidiaries are affiliated companies. They may not bid on the same bid at the same time, otherwise their bids will be rejected.
3.7 The bidder has not been restricted from participating in the bidding of the corresponding project due to violation of laws and regulations; the bidder is not being ordered to suspend business, the bid qualification is cancelled, and the property is taken over, frozen, and bankrupted.
3.8 The bidder’s other major designer requirements, as well as the specific requirements for other qualification requirements for qualification review, are found in the bidding documents.
3.9 The method used by the tenderee of the tendering project for qualification review of the bidder: review after qualification.
5.2 Deadline for submitting tender documents (Bid deadline, the same below) is 8:30 am, March 09, 2017

1500W AC Power Supply

APM ac power source model SP300VAC1500W provides a complete AC test solution with built in arbitrary waveform generator to simulate many types of power waveforms, at power levels up to 1500 VA.With better accuracy and faster response time, The dc and ac output power supply offers greater advantage for R&D and compliance tests.The application is from bench-top testing to mass production.

This AC source model SP300VAC1000W adopts high speed DSP+CPLD control, high frequency PWM power technology and active PFC design to realize AC/DC stable output.

Some features as below:


  • 4.3"large touch color screen
  • AC+DC mixed or independent output mode
  • Capable of setting output slope/phase angle
  • Built-in IEC standard test function
  • Built-in multiple protections
  • Built-in power meter
  • Support impedance function
  • Support for LIST/PULSE/STEP mode & Transient mode
  • Standard RS232/RS485/USB, Optional GPIB//LAN
  • Support harmonics/inter-harmonics simulation and measuring function
  • Support for USB data import/export and scree nap from front panel


1500W AC Power Supply,Adjustable 1500W Power Supply,1500W Power Supply,Ac Dc Power Source

APM Technologies Ltd , https://www.apmpowersupply.com