The relocation project of the electric power line of the Qiongzhong-Ledong Expressway (Wudzhi Mountain to Ledong Section) of this tendering project has been approved by the Hainan Provincial Traffic Engineering Construction Bureau under No. 136 of the China Construction and Construction Bureau and No. 279 of the China Construction and Construction Bureau. Construction, the project owner is Hainan Provincial Traffic Engineering Construction Bureau, the construction fund is from the government investment, the proportion of project investment is 100%, and the bidder is Shenzhen High Speed ​​Engineering Consultants Co., Ltd. The project has already met the conditions for bidding. The construction supervision of the project is now open for public bidding.
2. Project overview and scope of tender
2.1 Construction Location: Wuzhishan, Ledong.
2.2 Bidding content: The power grid renovation project along the Qiongle Expressway (Wuzhi Mountain to Ledong Section) consists of 6 35KV relocation projects in the main network, 46 relocations of 10KV, 27 380V and 13 220V low-voltage power lines in the distribution network. And the 110KV part of the power grid renovation project along the line, the southwest power plant ~ Yacheng 220KV, Longbei ~ Wen Luo 220KV power line relocation.
2.3 Supervision service period: 19 months, including construction preparation period of 1 month, construction period of 6 months, defect liability period of 12 months.
2.4 Bidding scope: Supervision of the construction of power lines of Qiongzhong-Ledong Expressway (Wudzhi Mountain to Ledong Section).
2.5 This tender is divided into one construction supervision bid section.
3. Bidder qualification requirements
3.1 The bid invitation requires the bidder to have an independent legal person qualification, and has the qualifications of the second or higher power engineering supervisor issued by the construction administrative department. From January 1, 2013, the bidder has completed at least two performances of construction supervision for newly-built or relocated electric power projects of no less than 220kV, and has corresponding supervision capabilities in terms of personnel, equipment, funds, etc., among which bidders propose The chief management engineer must have a national registered supervision engineer certificate (electrical engineering specialty) and be registered in this unit within the validity period. At least one supervising engineer who is not less than 220kV shall be responsible for the construction supervision project for new or relocated power engineering.
3.2 This tender does not accept (accept or not accept) the consortium bid.
4. Acquisition of tender documents
4.1 Any interested bidder is invited to enter 2017-02-14 08:30:00 to 2017-02-21 17:30:00 (excluding legal holidays, statutory holidays, Beijing time, the same below)
60 Macbook Charger

The 60W Macbook Charger with MagSafe1 or Magsafe 2 Power Adapter has a magnetic DC connector, so if someone trips on it, the power cord disconnects harmlessly, keeping your MacBook Air safe. It also helps prevent the cable from fraying or weakening over time. Additionally, the magnetic DC helps guide the plug into the system for a quick and safe connection.
60W Apple charger usb c,60w charger macbook air,macbook 60w charger
Shenzhen Waweis Technology Co., Ltd. , https://www.waweis.com