GTAT will supply large diameter sapphire core material to Chongqing Silian Optoelectronics Co., Ltd.

GT Crystal Systems has entered into a purchase agreement with Chongqing Silian Optoelectronics Technology Co., Ltd. ("Silian") to supply 500,000 TIE (equivalent to 2 inches) 6-inch C-face sapphire core material, which will be used by Quadruple. Materials are produced in high quality sapphire substrates for the high brightness LED industry.

According to GT Advanced Technologies, the agreement further demonstrates that the sapphire material grown in the ASFTM furnace is well suited for use in the LED supply chain. Silian Optoelectronics said: The sapphire grown in the ASF furnace can help Silian and our customers achieve the high output required by the increasingly mature LED industry. The sapphire grown in the ASF furnace is consistent and of high quality, which can meet the needs of the company.

The ability of GT to produce LED-grade sapphire over 6 inches in diameter can help accelerate the transition to MOCVD next-generation production tools that can handle larger diameter wafers. The current generation of MOCVD production tools can handle both 2-inch and 4-inch wafers, and larger substrates enable more efficient MOCVD production processes. The wafers produced in the ASF sapphire growth furnace at GT's newly expanded manufacturing facility in Salem, Mass., will be used to produce large diameter cores. This technology is the same as the technology sold to GT ASF equipment customers.

Countdown Timer

FUNCTION DESCRIPTION

Countdown socket has an AC outlet, the maximum can output 230 V16A of power, there are two control modes, that is, countdown off and countdown on. It is convenient to control the equipment which needs to switch off or turn on AC. improve the safety of the use of some equipment and save more energy.


SET Timer

1,Countdown plug in the socket, all indicator lights red flash three times, at this time the socket has no output, for the normal state, into the countdown state. Click the button, the first red light up, the socket output after an hour off, and then short press the button can set the socket timing of 2 H.4H.6H.8H.10H.OFF.

2,Long press button 3s, all indicator lights green flash three times, at this time the socket has output, for the regular open state, into the countdown on state. Click on the button, the first green light on, the socket is closed an hour later, and then press the button to set the socket countdown 2 H.4H.6H.8H.10H.OFF.

3,Press button 3 longer S, all indicator lights red light flash 3 times again into countdown mode.

4,Select the required countdown time mode, the corresponding mode countdown lights up, start countdown until the end of the countdown time. The outlet that controls the output will start or stop the output.

5,After the countdown starts, the time indicator will change automatically from high to low until the countdown is over.

NOTE:

1,Check that the power connection is good.

2,Use only indoors and in dry places.

3,This product does not convert AC voltage.

4,Maximum load not exceeding 16A 3680W.

5,Grounding is required for safety.

6,Any questions, please contact the electrician.

countdown timer socket, countdown timer plug, Countdown digital timer, Countdown socket, countdown switch socket

NINGBO COWELL ELECTRONICS & TECHNOLOGY CO., LTD , https://www.cowellsocket.com