On December 9th, at the “Love Green Travel†environmental protection theme public welfare event held at the Caishikou Station on Line 4 in Beijing, the relevant person in charge of the Beijing-Hong Kong subway revealed that all underground wired stations on Line 4 and Daxing Line will be in the future. Carry out energy-saving renovation.
The Beijing-Hong Kong subway carried out the station lighting energy-saving renovation project in 10 stations of Line 4, replacing the traditional fluorescent tube with an LED light source with long service life and low power consumption to achieve energy-saving effect. The project needs to replace about 10,000 LED lamps.
According to reports, after the energy-saving renovation, the escalators in the stations of Metro Line 4 and Daxing Line are controlled by variable frequency speed control, which saves energy and reduces mechanical wear.
The Beijing-Hong Kong subway carried out the station lighting energy-saving renovation project in 10 stations of Line 4, replacing the traditional fluorescent tube with an LED light source with long service life and low power consumption to achieve energy-saving effect. The project needs to replace about 10,000 LED lamps.
According to reports, after the energy-saving renovation, the escalators in the stations of Metro Line 4 and Daxing Line are controlled by variable frequency speed control, which saves energy and reduces mechanical wear.

Spin Motor,Mini Spin Motor,Washing Machine Spin Motor,Automatic Wash Motor
WUJIANG JINLONG ELECTRIC APPLIANCE CO., LTD , https://www.jinlongmotor.com